Home // Projects // ICU Renovation & Infrastructure Upgrades

ICU Renovation & Infrastructure Upgrades

Jefferson Health Washington Township, NJ

gb_220914_2427-Pano_R.jpg

Jefferson Health’s Washington Township campus aims to bring world-class healthcare to the South Jersey community with a wide variety of services and a patient-first care model. The Carlin Collaborative was engaged to manage various, overlapping renovation and expansion projects throughout Jefferson Health’s Washington Township Campus.

Jefferson Health’s ICU Renovation included the creation of 12 new private Intermediate Care Beds, renovation of EVS, storeroom, morgue, and conference expansion. The renovation was under an aggressive schedule to match the client’s updated tower and required additional services for HVAC design challenges. The TCC team led additional HVAC upgrades, installation of AHU, electrical work, and renovation of guest services space to create a new physical lounge, offices, and residential on-call suite.

gb_220914_2286_R.jpg
gb_220914_2584_R-2-1.jpg

Full project management services were provided by TCC from planning through occupancy, including the coordination of ICRA and construction activities in an active healthcare building. Throughout the project TCC applied thorough communication strategies to ensure that design, construction, owners, and vendors were equipped and aware of project pieces. TCC facilitated problem solving through all phases and ensured that Jefferson Health standards were maintained throughout the facility.

Project Collaborators

Buckl Architects Logo
LF Driscoll Logo
Barton Associates Logo

A hospital hallway with a reception desk and chairs for patients and visitors.
A well-lit lobby with couches and chairs
Jefferson Health’s ICU Renovation front desk

Featured Team Members